REQUEST FOR PROPOSAL: Design, Assembly, Programming, and Deployment Support of AI-Enabled Forest Monitoring Devices
Project Information
- Issue Date 30 Jan 2026
- Submission Deadline 28 Feb 2026
-
Procurement Method
Open
Competitive Bidding - Reference Number M-SITU/YEIC/R2/2026
-
Procuring Entity
Zalika Greentech Ltd
(Operating M-Situ AI Initiative)
Project Details
SECTION I: INVITATION TO BID
Zalika Greentech Ltd, through its advanced M-Situ AI Initiative, invites sealed, comprehensive technical and financial proposals from eligible and qualified Information and Communication Technology (ICT) firms, electronics manufacturers, and system integrators.
The scope of work covers the complete design, assembly, software integration, delivery, and post-deployment support for 120 AI-enabled forest monitoring devices. The selected bidder (the “Supplier”) will be responsible for the end-to-end delivery of a field-ready solution.
SECTION II: BACKGROUND AND PROJECT CONTEXT
M-Situ AI is an advanced, AI-driven environmental monitoring program dedicated to the conservation of forest ecosystems through the reduction of illegal activities.
The project aims to use and integrate cutting-edge edge-AI technology for real-time threat detection in remote, harsh environments.
PROJECT OBJECTIVES
- To reduce deforestation by a minimum of 20% in target areas by the end of 2026.
- To significantly improve the accuracy and reliability of early warning systems, targeting a 80% reduction in false alarms by the end of 2026.
- To establish a scalable, robust, and continuous forest surveillance platform with minimal human intervention.
SECTION III: SCOPE OF WORK (SOW)
The SOW is non-exhaustive and covers all aspects necessary to deliver 120 fully functional, field-ready monitoring devices integrated with the M-Situ backend platform.
A. Hardware Design and Assembly
- Procurement and integration of all necessary high-quality, industrial-grade components, including certified sensors, robust power management systems, and communication modules.
- Design and assembly of a highly durable, custom-designed, weather-resistant enclosure suitable for continuous outdoor deployment. The enclosure must meet a minimum environmental protection rating of IP67.
- Integration of a reliable solar photovoltaic power system with a high-capacity battery backup providing a guaranteed minimum of seven (7) days of operational autonomy without any sunlight or charging input.
- Component End-of-Life (EOL) and Supply Chain Risk Assessment identifying the manufacturer and lead-time of all major components and a plan for managing obsolescence over a minimum 5-year service period.
B. Software and Firmware Development
- Final development, comprehensive testing, and installation of the calibrated, proprietary firmware on all devices.
- Full-spectrum calibration and verification of all integrated sensors (sound, vibration, motion, temperature) to ensure detection accuracy within defined parameters.
- Complete integration of the device communication modules with the M-Situ backend platform via secure and documented Application Programming Interfaces (APIs), following all specified security protocols.
- Implementation of on-device (edge-level) AI inference capabilities for local data processing, intelligent event classification, and minimization of bandwidth usage.
- Provision of full capabilities for remote device configuration, continuous diagnostics, and Over-The-Air (OTA) firmware updates for life-cycle maintenance.
C. Installation, Commissioning, and Support
- Provide necessary technical support, documentation and guidance during the deployment and installation phases.
- Conduct full functional testing and acceptance sign-off of all devices in-situ (on-site).
- Provide agreed-upon post-installation, maintenance and technical support during the warranty period.
SECTION IV: DELIVERABLES AND MILESTONES
| Deliverable/ Milestone | Description | Payment (Indicative) |
| Contract Signing | Formal execution of the Contract Agreement. | 30% Advance Payment |
| Milestone 1: Prototype Approval | Delivery and formal acceptance of the final approved prototype(s) and a functioning set of first 10 devices. Submission of a satisfactory progress report detailing component supply chain and the initial batch manufacturing process. | 20% Milestone Payment |
| Milestone 2: Final Acceptance | Prerequisite: Successful manufacture, testing, and delivery of the full batch of 120 devices.
Successful deployment and commissioning of all 120 devices in the target area, evidenced by a minimum of 30 consecutive days of operation achieving the 98% sustained device uptime and 80% false alarm reduction targets specified in Section IX.5. Submission of all final technical documentation, source code escrow, and formal training records. Written final acceptance by Zalika Greentech Ltd. |
50% Final Payment |
SECTION V: BIDDER ELIGIBILITY AND MANDATORY REQUIREMENTS
Bidders must meet the following mandatory requirements and provide corresponding evidence:
- Valid Certificate of Incorporation or Business Registration Certificate.
- Valid Kenya Revenue Authority (KRA) PIN Certificate.
- Valid Tax Compliance Certificate from KRA.
- Current CR12 (or equivalent document) listing directors/shareholders.
- Evidence of successfully completing a similar ICT or electronics manufacturing project in the last three (3) years.
SECTION VI: EVALUATION CRITERIA
Proposals will be evaluated based on a minimum threshold followed by a weighted scoring mechanism in two stages: Technical (Mandatory + Weighted Scoring) and Financial.
| Stage | Category | Weight | Description | Minimum Threshold |
| 1 | Technical Proposal | 60% | Methodology, SOW Comprehension, Device Architecture, Compliance with Technical Specifications, Project Plan & Timeline. | 60% (To Qualify for Stage 2) |
| 2 | Financial Proposal | 30% | Cost-effectiveness, Completeness of Pricing Schedule, Payment Terms Acceptability. | N/A |
| 3 | Experience & Capacity | 10% | Company Track Record, Technical Personnel Qualifications (CVs), Availability of Local Support. | N/A |
| TOTAL | 100% | |||
SECTION VII: SUBMISSION INSTRUCTIONS
Bidders must submit two separate, clearly labeled envelopes/files: Technical Proposal and Financial Proposal.
Proposals must be submitted on or before 28th February 2026 at 1700 hrs EAT, either as a hard copy to the Company’s Post Office Box (8271 – 00200 Nairobi, Kenya), or electronically via email at info@m-situ.com
The subject line for electronic submission MUST be: ‘Request For Proposal – Zalika Greentech Ltd – M-SITU/YEIC/R2/2026’.
SECTION VIII: CONTRACT AGREEMENT CLAUSES
1. Payment Terms
- The total price is fixed (Firm Fixed Price) and payable upon full and satisfactory performance and delivery of all outputs specified in Section IV.
- All prices and payments shall be in Kenya Shillings (KES).
- The stated contract price is deemed to be VAT inclusive. Applicable taxes shall be governed by the laws of Kenya.
- No interest shall accrue on any advance or delayed payments.
2. Warranty & Defect Liability
- The Supplier must provide a minimum warranty period of twelve (12) months from the date of final acceptance.
- The warranty must cover manufacturing defects, component failures, firmware malfunctions, and performance below agreed technical specifications.
- The Supplier shall, at no additional cost to Zalika Greentech Ltd, repair, replace, or reconfigure defective deliverables during the warranty period.
- The Supplier shall adhere to a Service Level Agreement (SLA) during the warranty period, guaranteeing:
(a) 72-hour remote diagnostic response for critical performance failures, and
(b) 21-day resolution/replacement for any hardware defects.
- The warranty shall not cover damage from gross misuse, unauthorized modification, or Force Majeure events.
3. Intellectual Property
- All intellectual property (IP) rights arising directly from this contract, including firmware, device configurations, AI models trained on project data, and system architectures, shall vest exclusively in Zalika Greentech Ltd / M-Situ upon creation.
- Any IP owned by the Supplier prior to this contract remains their property. However, the Supplier grants Zalika Greentech Ltd a perpetual, irrevocable, non-exclusive, royalty-free license to use such pre-existing IP as embedded in the project deliverables.
- All data generated, collected, transmitted, or processed under this project is the exclusive property of Zalika Greentech Ltd.
- All raw, processed, and labelled data used for training, validating, or re-training any AI models for this project is the exclusive property of Zalika Greentech Ltd.
- The Supplier is strictly prohibited from reusing project data, commercializing derived models, or transferring Project IP to third parties without prior written consent from Zalika Greentech Ltd.
4. Confidentiality
Confidential information includes, but is not limited to, technical designs, source code, data sets, proprietary business strategies, and all non-public information disclosed.
The Supplier shall maintain strict confidentiality and shall not disclose any confidential information to third parties without prior written consent.
5. Penalties & Liquidated Damages
Delay penalties for failure to meet agreed milestones, liquidated damages shall be imposed equivalent to 0.5% of the contract price per week of delay, up to a maximum cap of 10% of the total contract value.
Performance failure to meet minimum technical specifications (e.g., uptime, data transmission rate) or performance thresholds may result in rejection of deliverables, mandatory corrective actions at the Supplier’s cost, and/or partial or full withholding of payment.
6. Termination
- Zalika Greentech Ltd may terminate the contract, in whole or in part, by giving thirty (30) days’ written notice.
- Zalika Greentech Ltd may also terminate immediately if the Supplier fails to perform material obligations, becomes insolvent, or engages in gross negligence or fraud.
- Upon termination, all completed work and Project IP must be immediately handed over to Zalika Greentech Ltd, and any unearned payments must be refunded.
7. Governing Law & Dispute Resolution
The contract shall be governed by the laws of the Republic of Kenya.
Disputes shall first be attempted to be resolved through amicable negotiation. If unresolved within a definitive period of thirty (30) days, the dispute shall be referred to binding arbitration in Nairobi, Kenya, in accordance with the Kenyan Arbitration Act.
SECTION IX: TECHNICAL SPECIFICATIONS
1. Device Overview
The devices must be AI-enabled, solar-powered Internet of Things (IoT) monitoring units, ruggedized for continuous, minimal-maintenance operation in remote forest environments.
2. Hardware Requirements
- Minimum IP67 rated weather-resistant enclosure.
- Solar power system with minimum 7 days of battery backup autonomy.
- Must include high-sensitivity environmental and activity sensors (sound, vibration, motion, temperature) with specified dynamic ranges.
- GNSS/GPS capability is strongly preferred for accurate device location, anti-theft tracking, and deployment verification.
3. Communication
- Bidders must propose the optimal and most reliable communication solution (e.g., GSM / LTE / NB-IoT / LoRa) for the target deployment areas, including a coverage analysis report.
- Guaranteed minimum 95% data transmission success rate to the M-Situ backend platform.
- All data transmission must utilize industry-standard encryption (e.g., TLS 1.2 or higher).
4. Firmware & Software
- Full capability for remote device management and configuration changes.
- Mandatory support for Over-The-Air (OTA) firmware updates.
- Seamless API integration with the M-Situ backend platform.
- Support for edge-level AI inference to reduce false positives, minimize bandwidth usage, and maximize real-time event detection.
5. Performance Requirements
- Operating temperature range of -10°C to +60°C.
- Minimum sustained device uptime of 98% (excluding planned maintenance).
- The device’s integrated AI/sensor performance must directly contribute to achieving the project target of a 80% false alarm reduction compared to current systems.
6. Documentation & Training
The Supplier must provide the following as final deliverables:
- Full, comprehensive technical documentation (schematics, Bill of Materials, component data sheets).
- Detailed and standardized maintenance manuals for field technicians.
- Formal, certified training for designated M-Situ technical staff on device operation, diagnostics, and Level 1 and Level 2 maintenance.
{ENDS}